Abrado Fishes Production Packer during Work-Over Operations
Cut Production Tubing above production packer, and pull/lay down production tubing and accessories. Design & execute Fishing procedure to retrieve production packer and tubing.
Well required the existing production packer and production tubing to be pulled to allow for a work over on this well. There were many variables and possibilities regarding the extraction of this packer.
E-Line found a restriction at 2347’ and a cut was required at 2330’. The recovered production tubing was laid down and the originally planned cut at 5,200’ was performed and remainder of production tubing pulled/laid down. Picked up with Overshot and tripped in hole. Latched and jarred production packer free and pulled out of hole. Monitored wellbore vitals while pulling out of hole. Made a final bit and scraper run to 5,240’ and circulated/conditioned the wellbore in preparation to continue Operator’s proposed work over procedures.